ISO 80369-20 Test Equipment
Choose ISO 80369-20 equipment by Annex, measured action and fixture role. KingPo equipment pages are available for Annex B/C leakage, Annex D air leakage, Annex F axial-load separation and the Connector Assembly Device.

8 products available for selection
Browse the current products, open one product page, and include the Standard Part, Figure or method, mating side, quantity and documentation needs in the quotation request.

ISO 80369-20 Annex B Liquid Leakage Tester
KingPo Annex B liquid leakage tester configuration for pressure-decay leakage setup planning, with product imagery, reference-connector context and RFQ preparation.

ISO 80369-20 Annex B/C Pressure and Liquid Leakage Tester
KingPo supplied documentation identifies this tester for ISO 80369-20 Annex B pressure leakage and Annex C positive-pressure liquid leakage workflows.

ISO 80369-20 Annex D Subatmospheric Air Leakage Tester
KingPo supplied documentation identifies this tester for ISO 80369-20 Annex D subatmospheric-pressure air leakage workflows.
test equipmentISO 80369 Multi-Mode Leakage Test Station
A leakage test station concept for RFQs that need pressure, fixture and connector requirements reviewed together.
test equipmentISO 80369-20 Annex F Axial Load Separation Tester
KingPo supplied documentation identifies this equipment for ISO 80369-20 Annex F resistance to separation from axial load, including force, displacement, software and report workflow context.
test equipmentISO 80369 Overriding Resistance Tester
Supports overriding-resistance discussions where force application, connector support and measurement scope must be confirmed.
test equipmentISO 80369 Luer Lock Torque Tester
Provides controlled torque application for assembly, unscrewing and overriding-related connector evaluation.

ISO 80369-20 Connector Assembly Device
KingPo supplied documentation identifies the Connector Assembly Device as the force-and-torque assembly device used when connecting a reference connector with a test sample before selected ISO 80369-20 workflows.
Start with the connector or test role
State the tested connector, male or female side, lock or slip interface, and the Figure or Annex when known.
Review the standard relationship
Use the technical standard page to understand Figure roles, mating counterparts and related ISO 80369-20 methods.
View ISO 80369-20Quote the complete requirement
Include counterpart, fixture, equipment, calibration and documentation needs so the requested scope is unambiguous.
Request a quoteStart from the Annex before choosing equipment
ISO 80369-20 is a common-method standard, so the right KingPo item depends on whether the buyer needs leakage, axial force, torque/assembly support or a fixture-only discussion. This matrix keeps equipment pages from mixing those roles.
| Annex | Method / role | What the equipment must support | KingPo path | Status |
|---|---|---|---|---|
| Annex B | Pressure leakage / pressure-decay route | Positive pressure, specimen volume and pressure-change record | Annex B liquid leakage tester | KingPo product photos and apparatus reference available |
| Annex C | Positive-pressure liquid leakage | Liquid tank route, blocked outlet and pressure record | Annex B/C leakage tester | KingPo documentation available |
| Annex D | Subatmospheric-pressure air leakage | Reduced-pressure channel and leakage-rate calculation fields | Annex D air leakage tester | KingPo documentation available |
| Annex E | Stress cracking | Assembled connector condition, fixture support and conditioning context | Stress-cracking fixture discussion | RFQ planning path |
| Annex F | Resistance to separation from axial load | Controlled axial movement, force record and fixture alignment | Annex F axial-load tester | KingPo documentation available |
| Annex G | Resistance to separation from unscrewing | Torque-weight assembly support before the selected torque workflow | Connector Assembly Device | KingPo documentation available |
| Annex H | Resistance to overriding | Force-and-torque assembly context plus overriding equipment discussion | Connector Assembly Device | KingPo documentation available |
| Annex I | Disconnection by unscrewing | Connector family, torque direction and holding fixture must be defined | Ask KingPo to confirm equipment | No public product page yet |
| Annex K | Air leakage during aspiration | Aspiration-related air leakage route; confirm if a custom fixture is needed | Ask KingPo to confirm equipment | No public product page yet |
Open the page that matches the measured action
Prepare the Annex, connector family, mating reference item, fixture need, report format and certificate expectation together. That is the information KingPo needs to quote a complete setup.
Pressure-decay leakage
Use when the request is specifically leakage by pressure decay. Include specimen, mating reference connector, test volume, fixture interface and result-record expectation.
Annex CPositive-pressure liquid leakage
Use when the RFQ names positive-pressure liquid leakage or the combined KingPo pressure/liquid workflow. Include liquid handling, blocked outlet, sample support and report expectation.
Annex DSubatmospheric air leakage
Use when the method is reduced-pressure air leakage. Confirm pressure range, specimen connection, sample support and report printout needs.
Annex FAxial-load separation
Use when the result depends on controlled axial force or displacement. Provide mating counterpart, fixture restraint and software/report requirements.
Assembly deviceForce and torque setup
Use when the connector must be assembled with defined force and torque before leakage, unscrewing, overriding or stress-related checks.
Annex EStress cracking setup
Use when the request is fixture and conditioning support for an assembled connector. Confirm connector material, assembly route and exposure requirement before quotation.
Send the method and sample context
Include the Annex, tested connector side, mating connector or reference connector, sample volume where relevant, fixture interface and desired report output.
Use product pages for equipment selection
Public pages summarize equipment roles and KingPo supplied documentation. Controlled standard limits and final acceptance wording should be confirmed with the selected order scope.
Ask when Annex I or K is required
Annex I and Annex K are kept as RFQ-confirmation routes until KingPo publishes a specific equipment page for those methods.
