manual

ISO 80369-20 Operating Guidance

KingPo operating guidance preview covering pressure leakage startup, pressure liquid setup, subatmospheric pressure operation and connector assembly device operation.

ISO 80369-20 Operating Guidance ISO 80369 visual
Direct answer

What this resource helps prepare

KingPo supplied operating documents describe practical startup and setup steps: place the tester on a stable desktop, connect power where required, select the touch-screen function, install the sample, set time and pressure where applicable, and start the test.

This guidance is based on KingPo supplied operating materials. The applicable controlled operation document is confirmed with the selected order scope.

Checklist

Fields to collect before the next step

Pressure leakage: set test time, test pressure and sample volume.

Pressure liquid leakage: connect the liquid tank valves, fill the funnel, block the sample outlet and start the test.

Subatmospheric leakage: set pressure/time/sample volume and adjust the air pressure valve.

Connector assembly: insert the reference connector hex end, hold the sample and apply force and torque.

KingPo pressure and positive-pressure liquid leakage tester touch screen
Annex B/C leakage tester touch-screen fields from KingPo supplied operating material.
KingPo subatmospheric-pressure air leakage tester touch screen
Annex D subatmospheric-pressure operating screen from KingPo supplied operating material.
KingPo connector assembly device operation view
Connector Assembly Device operation context for applying force and torque.