ISO 80369-20 Operating Guidance
KingPo operating guidance preview covering pressure leakage startup, pressure liquid setup, subatmospheric pressure operation and connector assembly device operation.

What this resource helps prepare
KingPo supplied operating documents describe practical startup and setup steps: place the tester on a stable desktop, connect power where required, select the touch-screen function, install the sample, set time and pressure where applicable, and start the test.
This guidance is based on KingPo supplied operating materials. The applicable controlled operation document is confirmed with the selected order scope.
Fields to collect before the next step
Pressure leakage: set test time, test pressure and sample volume.
Pressure liquid leakage: connect the liquid tank valves, fill the funnel, block the sample outlet and start the test.
Subatmospheric leakage: set pressure/time/sample volume and adjust the air pressure valve.
Connector assembly: insert the reference connector hex end, hold the sample and apply force and torque.



Related products and standards
Confirm the applicable standard, product family and test method, then include the required quantity, fixtures and documents with your inquiry.
ISO 80369-20 Annex B/C Pressure and Liquid Leakage Tester
KingPo supplied documentation identifies this tester for ISO 80369-20 Annex B pressure leakage and Annex C positive-pressure liquid leakage workflows.
ISO 80369-20 Annex D Subatmospheric Air Leakage Tester
KingPo supplied documentation identifies this tester for ISO 80369-20 Annex D subatmospheric-pressure air leakage workflows.
ISO 80369-20 Connector Assembly Device
KingPo supplied documentation identifies the Connector Assembly Device as the force-and-torque assembly device used when connecting a reference connector with a test sample before selected ISO 80369-20 workflows.
ISO 80369-20
Common test method relationship hub for ISO 80369 performance workflows.
